Several Routes and associated cue sheets are available at the VeloRaptors group on the Ridewithgps site. You can open the link here.
Category: Ride Sheets
Half Moon Bay – Davenport 90 mi loop
Half Moon Bay – Davenport Loop
Route: 90 miles | Route Sheet
Davis Ride
Two Bridge Ride
Two Bridges Ride over the Carquinez and Benecia Bridges
–Two Bridges Route 1 Loop from Pleasant Hill BART
Route: 45.2 miles | Route Sheet
–Two Bridges Route 2 Orinda to North Concord BART stn.
42 miles, 2400 ft of ascent