The inaugural VeloRaptor hike on 9/20/2025 was in Anthony Chabot Regional Park. 20 intrepid members followed a beautiful loop from the Clyde Woolridge Staging Area down the Jackson Grade to the Stone Bridge, picked up the Brandon trail and went south to Two Rocks trail, from which we dropped down to the Columbine trail, then returned via Lake Chabot on the Goldenrod trail.

